• Advertise With Us
  • Contact us
Sunday, January 25, 2026
No Result
View All Result
Download App
Asian News Hub
  • Home
  • State
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Middle East
  • Home
  • State
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Middle East
No Result
View All Result
Asian News Hub
No Result
View All Result
  • State
  • National
  • International
  • Entertainment
  • Business
  • Sports
  • Medical Science
  • Middle East
  • Politics

Power Shutdown in Kashmir Parts

Asian News Hub by Asian News Hub
January 27, 2025
in State
Reading Time: 3 mins read
A A
Unending Saga of Unscheduled Outages and Distress Cuts in Kashmir
0
SHARES
596
VIEWS
Share on WhatsAppShare on Facebook
JOIN OUR WHATSAPP CHANNEL

Srinagar, Jan 27: According to the Chief Engineer, Distribution, KPDCL, in order to carry out Temporary shifting and permanent raising of Sopore Tap Line near Lalad Amargarh, the shutdown of 33KV Delina-Sopore Line shall be observed due to which Receiving Station at Sopore-II shall remain off while power supply to the Sopore Town, Amargarh, Krankshivan Colony and adjoining areas will be affected from 10:00 AM to 04:00 PM on 29 January, 2025.

Asian News Hub Asian News Hub Asian News Hub

Similarly, to carry out the Augmenation of 0.1 ACSR to 0.2 ACSR of Nehalpora Markundal Line, the shutdown of 33KV Nehalpora-Markundal Line shall be observed due to which 33/11KV Receiving Stations at Markundal, Naidkhai, Shahgund, Aglar shall remain off while the power supply to Naidkhai, Markundal, Sumbal, Ankhul, Gundboon and adjoining areas will be affected from 10:00 AM to 03:00 PM on 29 January and 01 February 2025.

Also, to carry out Evacuation of power from GIS Tengpora Grid Station, the shutdown of 33KV GIS Tengpora KP Bagh Line and GIS Tengpora Exhibition Line shall be observed due to which 33/11KV Receiving Stations at KP Bagh, Jawahar Nagar and Rajbagh shall remain off while power supply to the KP Bagh, Jawahar Nagar, Rajbagh and Danderkha areas will be affected from 11:00 AM to 03:00 PM on 29 January, 2025.

Further, to carry out the work of installation of 33 KV isolator on 33 KV Bemina Exhibition Line, the shutdown of 33KV Bemina-Exhibition Line shall be observed due to which 33/11KV Receiving Stations at GIS Batmaloo, Court Complex shall remain off while power supply to the Batmaloo Adda, Moominabad Batmaloo, Court Complex Mominabad areas will be affected from 11:00 AM to 04:30 PM on 02 February, 2025.

In order to carry out the balance left over work by way of erection of poles as well as laying of new conductor, the shutdown of 33KV Bemina KP Bagh Line shall be observed due to which 33/11KV Receiving Station at Rakhiarth shall remain off while power supply to the Rakhiarth, Hamdania Colony areas will be affected from 11:00 AM to 04:30 PM on 29 January and 01 February, 2025.

Body of Missing Youth Retrieved from Jhelum in Srinagar

Moreover, to carry out Stringing of ACSR Conductor, the shutdown of 33KV Delina Line shall be observed due to which 33/11KV Receiving Stations at Sopore-2nd, Delina and Jetty shall remain off while power supply to the Sopore-Town, Amargarh, Krankshivan Colony, Delina, BSF, Kanispora, Jahama, Kralhar, Chandsooma, Khawajabagh, Jetty, Transit Accomodation, PHE Jetty and adjoining areas will be affected from 11:00 AM to 02:00 PM on 29 January, 2025.

Also, to carry out Ongoing work on 33 KV Kalantra tap Line, the shutdown of 33KV Wagoora line shall be observed due to which 33/11KV Receiving Stations at Sangram, Wagoora, Kreeri and Ichloo shall remain off while the power supply to the Wagoora, Kreeri, Mangam, Kawcheck and adjoining areas will be affected from 10:00 AM to 04:00 PM on 29 January, 2025.

Further, to carry out Replacement of deteriorated poles of 33 KV Line, the shutdown of 33KV Baramulla-1st and Baramulla-2nd Line shall be observed due to which 33/11KV Receiving Stations at Baramulla-1st, Kanlibagh, GMC, Baramulla and Baramulla-2nd shall remain off while the power supply to the Baramulla Town, GMC Baramulla, Kanlibagh, Old Town, Azad Gunj, Janbazpora and adjoining areas will be affected from 11:00 AM to 02:00 PM on 02 February, 2025.

In order to carry out Stabilization of line, the shutdown of 33KV Kongamdara Line shall be observed due to which 33/11KV Receiving Stations at Kunzar and Dhobiwan shall remain off while power supply to the Kunzar, Dhobiwan and adjoining areas will be affected from 10:00 AM to 04:00 PM on 29 January, 2025.

To facilitate HT Conductoring works under RDSS, the shutdown of 33KV Badampora Lar Tulmulla Line shall be observed due to which 33/11KV Receiving Stations at Tulmulla, Kheerbhawani and Lar shall remain off while the power supply to the Repora, Watlar, Lar, Tulmulla, Kheerbhawani and adjoining areas will be affected from 10:00 AM to 03:00 PM on 01 & 06 February, 2025.

Similarly, to carry out Stabilization works, the shutdown of 33KV Nadhihal Tap Line shall be observed due to which 33/11KV Receiving Station at Ajas shall remain off while power supply to the Ajas, Bazipora,  SK Bala and adjoining areas will be affected from 10:00 AM to 04:00 PM on 30 January & 01 February, 2025.

Also, to carry out Stabilization works, the shutdown of 33KV Badampora Safapora Tapline shall be observed due to which 33/11KV Receiving Station at Safapora shall remain off while power supply to the Safapora, Gratbal, Jarakobagh and Manasbal areas will be affected from 10:00 AM to 04:00 PM on 30 January, 2025.

Tags: Featured
Asian News Hub

Asian News Hub

Asian News Hub Pvt. Ltd. – Your Gateway to Comprehensive Journalism

Related Posts

Woman Dies After Falling from Height at Home in Brain Nishat

Kashmir doctor’s wife dies in Mecca after critical illness

January 25, 2026
Police sub-inspector injured in attack by armed men in Jammu

Lineman electrocuted while on duty in Budgam, critical

January 24, 2026
Fire Damages Lobby of J&K Assembly Building

Guest house damaged in Dal Lake fire, one injured

January 24, 2026
Power grid collapses as snowstorm paralyses Kashmir

KPDCL restores 80% power network after snowfall, gusty winds across Kashmir: Govt

January 23, 2026
On Democracy Day, CM Omar Calls for Stronger Democratic Values in J&K

Restoration of essential services government’s top priority: CM Omar

January 23, 2026
Power grid collapses as snowstorm paralyses Kashmir

Power grid collapses as snowstorm paralyses Kashmir

January 23, 2026

Recommended

Body of Bemina resident found in Srinagar outskirts

Lineman Dies After Falling from Electric Pole in Hawal, Srinagar

9 months ago
SIA arrests Sarjan Barkati

SIA arrests Sarjan Barkati

2 years ago
Honey-trap gang busted in Srinagar, two women among 4 arrested

Honey-trap gang busted in Srinagar, two women among 4 arrested

3 years ago

Popular News

  • Two woman among 4 dead as boat capsizes in Jhelum in Srinagar

    After long wait and heartbreak, Gandbal boat tragedy victim finally found in Jhelum

    0 shares
    Share 0 Tweet 0
  • Lineman electrocuted while on duty in Budgam, critical

    0 shares
    Share 0 Tweet 0
  • Power grid collapses as snowstorm paralyses Kashmir

    0 shares
    Share 0 Tweet 0
  • Gusty winds sweep through J&K parts, damage property, disrupt power supply

    0 shares
    Share 0 Tweet 0
  • Throat-slit body of elderly woman found at her residence in Srinagar

    0 shares
    Share 0 Tweet 0
Asian News Hub

Established in 2018 as a pioneering news and media entity operating from Srinagar, Jammu, and Kashmir

Links

  • Download Our App
  • Contact us
  • Disclamer
  • Privacy Policy

Popular Categories

  • State
  • National
  • International
  • Politics
  • Sports

Download Our App

Follow on Google News

Copyright © 2018 - 2025 Asian News Hub.
Powered By

No Result
View All Result
  • Home
  • State
  • National
  • International
  • Business
  • Sports
  • Entertainment
  • Medical Science
  • Middle East
  • Politics

Copyright © 2018 - 2025 Asian News Hub.
Powered By