• Advertise With Us
  • About us
  • Contact us
Friday, June 27, 2025
No Result
View All Result
Download App
Asian News Hub
  • Home
  • State
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Middle East
  • Home
  • State
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Middle East
No Result
View All Result
Asian News Hub
No Result
View All Result
  • State
  • National
  • International
  • Entertainment
  • Business
  • Sports
  • Medical Science
  • Middle East
  • Politics

AC approves roll out of Rooftop Solar Scheme in Jammu and Kashmir

Asian News Hub by Asian News Hub
June 11, 2022
in State
Reading Time: 3 mins read
A A
Administrative Council approves scheme for promotion of PM package employees
0
SHARES
44
VIEWS
Share on WhatsAppShare on Facebook
JOIN OUR WHATSAPP CHANNEL

Srinagar, June 11: The Administrative Council (AC), which met here under the chairmanship of Lieutenant Governor, Manoj Sinha, approved the installation of 200 MW of grid-tied rooftop solar power plants under the “Solar City Mission” in Jammu.

Asian News Hub Asian News Hub Asian News Hub

Rajeev Rai Bhatnagar, Advisor to the Lieutenant Governor, Dr. Arun Kumar Mehta, Chief Secretary, J&K and Nitishwar Kumar, Principal Secretary to the Lieutenant Governor attended the meeting.

The decision has been taken to implement the Government of India’s Grid-connected Rooftop Solar Scheme, Phase-II for the residential sector in Jammu and Kashmir to ensure that the electricity needs of the city are fully met from solar energy.

Under the project, 200 MW grid-tied rooftop solar power plants will be installed on 50,000 residential buildings in Jammu city by the Jammu and Kashmir Energy Development Agency (JAKEDA) under its “Solar City Mission” at an estimated cost of Rs 1040 crore. The project will be completed by March, 2024 and will have a lifetime of 25 years.

The Rooftop Solar Programme will provide subsidized installation of solar power panels on residential houses at the cost of Rs. 58,739, Rs. 53,995, Rs. 52,594, and Rs. 51,309 for Category-A (Up to 1 kW), Category-B (> 1 kW to 2 kW), Category-C (> 2kW up to 3 kW), and Category-D (> 3 kW up to 10 kW), respectively.

The Central Sector Scheme provides a central subsidy component of 40% of the project cost and a state subsidy component of 25% of the project cost for the installation of solar power panels, below 3 kW capacity, beyond which the central subsidy component remains at 20%. The subsidy will be provided to the beneficiaries through the DBT mode.

These rooftop solar power plants will be connected to the grid on a net metering basis. The investments made by the beneficiaries will be recovered at a rate of 25% annually on account of the saving of energy, with a payback period of approximately 4 years.

Also Read: Lightning strike kills woman in Ganderbal

With the implementation of the project, J&K will benefit from the generation of approximately 280 million units of energy annually, with a corresponding reduction in carbon emissions of approximately 5.44 million tons, besides reaping gains from savings on account of inter-state transmission losses to the tune of 224 million units.

The generation of solar energy through the Rooftop Solar Programme will also help the energy-deficit UT of J&K in supplementing its energy needs, while assisting the DISCOMs in achieving the Renewable Purchase Obligation (RPO) Targets of 10.5% as fixed by the Government of India.

The project will also provide employment opportunities to local youth. Based on employment estimates, it is calculated that the 1 MW rooftop solar PV project generates a total of 40 full-time equivalent (FTE) jobs over the 25 years expected lifetime of the project, which includes highly skilled personnel for business development, design, sales, procurement, and project management; one-time jobs for construction and installation of the rooftop PV system; and unskilled resources required annually for cleaning activity of the plant.

A number of additional job roles are also created by solar PV grid-connected projects in secondary and tertiary roles vis-à-vis manufacturing and supply of system equipment such as inverters, cables, trackers, and other parts. As such, around 8000 jobs will be generated through the project.

The scheme mandates implementing agency, viz. JAKEDA to provide regular quality supervision and certification of the quality of material to be installed; periodic monitoring of physical progress and third-party quality checks from MNRE approved test centres; provide free maintenance for a period of 5 years post installation; install bi-directional net-meters; and ensure project completion within the given timelines.

Tags: Baramulla newsBudgam newsFeaturedKashmir newsKulgam newsSrinagar news
Asian News Hub

Asian News Hub

Asian News Hub Pvt. Ltd. – Your Gateway to Comprehensive Journalism

Related Posts

Delhi High Court Rejects Bail Plea of Separatist Leader Shabir Shah

Delhi Prisons Deny Critical Health Rumours of Shabir Shah

June 27, 2025
Three Booked Under PSA in Sopore for Anti-National Activities

Three Booked Under PSA in Sopore for Anti-National Activities

June 27, 2025
Kashmiri Shias protest killing of Hezbollah chief after Friday prayers

Kashmir Marks Beginning of Islamic New Year, Muharram Observances Begin

June 26, 2025
All Set for Safe, Smooth Amarnath Yatra: LG Manoj Sinha

All Set for Safe, Smooth Amarnath Yatra: LG Manoj Sinha

June 26, 2025
Sopore Chemists and Druggists Lead Drug Awareness Rally on World Drug Day

Sopore Chemists and Druggists Lead Drug Awareness Rally on World Drug Day

June 26, 2025
Two Children Die, One Rescued After Flash Flood in J&K’s Rajouri

Two Children Die, One Rescued After Flash Flood in J&K’s Rajouri

June 26, 2025

Recommended

Cyber Police Kashmir Refutes Fake Claims of Anti-National Posters, Warns of Legal Action

Cyber Police Kashmir Refutes Fake Claims of Anti-National Posters, Warns of Legal Action

5 months ago
Asian News Hub

Amshipora fake encounter: Have no system of cash rewards for our men, says Army

4 years ago
Pan India Scheme: Railways install food stalls across 17 stations of Banihal-Baramulla corridor

Pan India Scheme: Railways install food stalls across 17 stations of Banihal-Baramulla corridor

2 years ago

Popular News

  • Budgam Transformer Blast: Injured JE and Technician Succumb to Injuries

    Budgam Transformer Blast: Injured JE and Technician Succumb to Injuries

    0 shares
    Share 0 Tweet 0
  • Three Girls Paint Israeli Flag Near Imambara Zadibal, Police Initiate Legal Action

    0 shares
    Share 0 Tweet 0
  • Iran’s Missile Strikes on Israel Kill 28, Injure Over 3,000

    0 shares
    Share 0 Tweet 0
  • Srinagar Police Detain Two for Placing Foreign Flags in Balhama

    0 shares
    Share 0 Tweet 0
  • Rains, Thunderstorms Expected Across J&K; Heatwave to Ease from June 21

    0 shares
    Share 0 Tweet 0
Asian News Hub

Established in 2018 as a pioneering news and media entity operating from Srinagar, Jammu, and Kashmir

Links

  • Download Our App
  • About us
  • Contact us
  • Disclamer
  • Privacy Policy

Popular Categories

  • State
  • National
  • International
  • Politics
  • Sports

Download Our App

Follow on Google News

Copyright © 2018 - 2025 Asian News Hub.
Powered By

No Result
View All Result
  • Home
  • State
  • National
  • International
  • Business
  • Sports
  • Entertainment
  • Medical Science
  • Middle East
  • Politics

Copyright © 2018 - 2025 Asian News Hub.
Powered By